Zhongshan Weimin hotel banquet hall movable partition project(I) -------loading

Zhongshan weimin hotel located in Lighting Capital of China --- Guzhen town,Zhongshan city.Its a newly construction five starred hotel in Guangdong province.Egood established business relationship with Weimin hotel, responsible for the whole process including design,manufacture,and today is delivery date we agreed in contract. Following is the loading moment recorded in Egood factory. 

 

 

 

Although it has been raining for several days and the ground is still wet,but we all full of passion.It has 6.5 meter high and 8 meter high partition,takes 10 strong men to carry each of the panel. 

 

 

 

 

Less than 2 hours,we finished loading, and the truck carry our partition towards to the destination-zhongshan city.

 

 

 

 

As you can see,everyone were dripping with sweat, In here, I would like to express the sincere regards and the heartfelt gratitude to the  participant staff: You were laborious!

 

 

 




Your position:Home > News > Company news

More Company news>>>

  • Chamber room acoustic solid sliding folding partition ..
  • Egood has been awarded..
  • Egood partition J2019123003 foreign trade order sent to Libya..
  • The Development Trend Of Movable Partition Industry..
  • The seventh batch of EG2019070101 order to Hainan was completed..
  • Egood hold a technical symposium with Hongkong Egood Industrial L..
  • Sweep or save
    Invite friends to sweep to TA
    or Share

    Long press save two-dimensional code above, use WeChat to sweep the upper right corner of the "album" scan code, Share friends or circle of friends.