Check List Before Folding Wall Panel Production
Egood folding wall patition company offers products and services with the end user in mind,
in order to decrease mistakes in every production order ,Egood provides check list form to the cleint
to double check all critical points which mentioned on the form,try the best possibility to minimize mistakes
EGOOD FOLDING WALL PARTITION - PRODUCTION CHECKLIST | |||
Import Aspect need to be considered before finalize and sign our technical drawing for producion | |||
Items | Diagram and instruction | Feedback | Remark |
1.width(length) :should be from the finished wall to finished wall or column to column,if there ar any decoration on the wall or colum,have to subtract(reduce the thickness first before finalized the final length width, the max deviation is 20mm acceptable | |||
2.Height:Should be from finished floor(after flooring ,tile or carpet) to the false ceiling which usally same level as the the bottom of track. Or proposed height if without flase ceiling or not one the same level ,the max deviation is 10mm accetable | |||
3.Head room:The height from the false ceiling to the concrete slabe bottom(roof) should be enough spacek for install the track system,usualy leave 200mm for type60,65,80 track, 250 for type 100 track | |||
4. Parking area dimenison:height and widh should be the same dimension caculation above above mentioned | |||
5.Elements may affect the the layout and dimenions from proposal drawing to actual site condition: 1.unlevel or unclear flooring ;2. unlevel or unclear false ceiling;3,wiring ,pipe or air duct;4.exposed corner deroration; 5.pocket door design and direction. 6.Head Room height not enough 7.total weight of the systems 8:thickness of the panel finishes by client ect. | |||
6.All Dimension shown on our proposal drawings are critical to production and proper partiton operation,if there are any doubt or changes are made,please conctact Egood immediately,any changes may incure serious onsequences for operatation ,and additional charges may incured | |||
7.Package :For safty transportation consideration,stronge recommend pack all goods into plywood case if total volum is small and requied to ship as LCL goods;loading the goods a own full container will the best solution to protect the goods | |||
8.Date of delivery :since all panel and finishes are customized,so it is impossible to delivery the goods in few days,Egood team will provide a schedule accoriding to the project completion time, if the project is big and urgent client can be order the tracks in advance ,and start the panel after the tracks installed, | advanges to order tracks first: 1.more earlier to start track installation will be more easier to complete the job than if after wiring,pile and air duce,and false ceiling,because steel sturucre supports intallting will become complicated 2. actuall dimenions for panel production after false ceiling and floor leveling and side decoration. 3.time saving and even all decoration are done,panel can be install easiliy in short time wihout ducts and noise; |